1. Installation is carried out in the reverse order.
2. Adjust shift cable.
3. Fill with engine oil.
4. Fill in a liquid in a transmission.
5. Clean the battery terminals and wire clamps with sandpaper, connect the wires and coat with anti-corrosion grease.
6. Check for a fuel leak.
7. If the engine does not start immediately after assembling the fuel line, bleed and pressurize the trapped air by turning on the low pressure pump using the GDS.
8. Check the fuel line for leaks.
9. Fill in cooling liquid in a radiator.
10. Remove air from the cooling system.
11. Start the engine and let it warm up (until the radiator fan turns on 3-4 times).
12. Stop the engine. Check the coolant level in the radiator; top up coolant if necessary. This will remove air from the cooling system.
13. Install the radiator cap tightly, restart the engine and check for leaks.