Contents: Removal ⇓ Installation ⇓
Removal
Attach the lifting mechanism clamps to the Hyundai Getz engine eyes and lift so that the engine weight is supported by the lifting mechanism.


1. Disconnect the engine mount bracket from the engine.

2. Loosen the bolts securing the elastic engine support.

3. Remove the air filter housing mounting bracket.

4. Loosen the gearbox support bracket mounting bolt (17 mm).

5. Remove the plugs from the inside of the right wing and unscrew the gearbox support bracket mounting bolts.

6. Remove the gearbox support bracket.
7. Disconnect the roller support bracket from the engine subframe.

Installation
Installation is carried out in the reverse order of removal.
